KC HiLiTES® Profile SideCast™ Four-Light Wiring Kit-Platform One™-10-25 Toyota 4Runner

Profile SideCast Wiring Kit-Platform One-10-25 Toyota 4Runner

Regular price$214.99
/
  • In stock, ready to ship
  • Inventory on the way
  • Official KC HiLiTES® Dealer
  • 100% Satisfaction Guaranteed
  • Free Shipping on Orders Over $69
  • Hassle-Free Delivery

Platform One SideCast Lights Wiring Kit

Seamlessly wire your Platform One™ rack’s side lighting with this complete vehicle-specific wiring kit. Designed for the 5th and 6th Gen 4Runners, it simplifies installation and enables a clean, Power-Ready™ setup using KC’s integrated wire channels and corner-mounted Junction Cap.

This complete wiring solution is designed to integrate four Profile 10” SideCast™ lights into your Platform One roof rack with ease. Compatible with 2010-2025 Toyota 4Runner (5th and 6th Gens), the kit includes a vehicle-specific harness and KC’s Power-Ready Junction Cap, which provides a clean, modular power hub on the corner of your rack. The harness routes discreetly through KC’s hidden wire channels, enabling a plug-and-play lighting setup that’s clean, durable, and adventure-ready.

FEATURES:

  • Vehicle-Specific Fit:
    • 2010-2025 Toyota 4Runner
  • Includes vehicle-specific wiring harness for four Profile SideCast™ lights
  • Power-Ready™ Junction Cap provides clean, low-profile connection point
  • Uses PL1's hidden internal wire channels for a clean, protected install

WHAT'S IN THE BOX:

  • (1) Vehicle-Specific Side Light Wiring Harness
  • (1) Power-Ready™ Junction Cap

Included Components

  • (1) Power-Ready™ wiring kit with (1) Power-ready™ Junction cap for 4 Profile Sidecast Lights

Mount Location

  • Roof Rack

Frequently Asked Questions

Yes, if they use standard M8 hardware.

Yes, in most cases. The modular design allows for multiple accessories. Plan your layout to avoid interference.

We ship via UPS. PL1 kits are “flat-packed” and UPS-compatible.

Shipping Information

Locally made in limited batches. Most orders ship within 2-4 weeks, but demand may extend lead times.